Pre-packaged and fiberglass stations
Installation of pre-packaged and fiberglass lift stations, including the excavation, setting and backfill the station manufacturer's details require.
Pre-packaged and fiberglass lift stations, force main and the gravity sanitary system that feeds them, installed by SDC utility crews.
Where site elevations or the receiving sewer system require pumping, a lift station and force main connect the development's sanitary collection system to the receiving utility. SDC installs those stations as part of its underground utility work: the wet well and pre-packaged or fiberglass station, the force main, and the gravity collection system upstream of it.
Our recent lift station work includes utility-standard stations built to Tohopekaliga Water Authority requirements in Osceola County, fiberglass stations on multifamily and residential communities, a station serving an Osceola County K-8 school, and relocation of an existing fiberglass station on an occupied residential site. Force main runs on those projects range from 130 LF to more than 1,500 LF.
Installation of pre-packaged and fiberglass lift stations, including the excavation, setting and backfill the station manufacturer's details require.
Stations built to the receiving utility's standard where the system is turned over to a public authority — including TOHO lift station installations in Osceola County.
4-inch through 12-inch force main installation, from short connections to multi-thousand-foot runs, with pressure testing and connection to the existing system.
The sanitary sewer system feeding the station — gravity mains, manholes and services, up to nearly 20,000 LF of pipe on a single community.
Relocating an existing station on an active site, and conversion of a lift station to a gravity manhole where a system is being re-routed.
Access drive, flatwork, grading, restoration and paving around the completed station, self-performed by the same SDC crews.
The station, force main and collection system delivered inside the same site package as earthwork, drainage and paving.
Station and force main installation sequenced around a building under construction — as on the K-8 KnightsBridge school site for Wharton-Smith.
Stations built to the utility's own standard and documented for acceptance by the authority that will operate them.
We review the sanitary plans, profiles and the receiving utility's standard details, confirm the station model and price the station, force main and collection work.
Wet well depth, groundwater, dewatering, sheeting and trench protection are planned before the excavation is opened.
Station setting, force main installation, pressure testing and connection to the existing system, with safety ranked above all other aspects of the operation.
Restoration around the station and the record documentation the owner and accepting utility need at turnover.
TOHO lift station installation with 1,540 LF of 8-inch force main and 19,925 LF of sanitary sewer on a 128-acre, 648-home development.
TOHO lift station installation with 1,185 LF of force main and 2,500 LF of sanitary sewer on a 100-acre multi-parcel development.
Lift station with 130 LF of 4-inch force main and 2,050 LF of 8-inch sanitary sewer on a 34-acre school site.
Fiberglass lift station and force main with the sanitary sewer system for nine residential buildings.
Fiberglass lift station with sanitary sewer, water and drainage systems for Toll Brothers.
Lift station installation with a complete sanitary sewer system of 6,000+ LF of pipe for K. Hovnanian Homes.