New roadway and widening
New roadway construction, lane widening and pavement reconstruction, including divided roadway sections and connector roads built to city and county standards.
New roadway, widening and reconstruction for city, county and private owners — including roundabouts, signalization and off-site improvements.
SDC is an FDOT certified roadway and utility contractor, and roadway work is one of the areas where self-performing matters most: a widening job is earthwork, drainage, utility relocation, curb, sidewalk and paving happening in a narrow corridor with traffic running through it.
Recent Central Florida roadway contracts include 3,300 LF of widening with a new roundabout for the City of Winter Garden, a 330-day connector road contract for the City of Oviedo, 3,000 LF of new divided roadway on Westside Boulevard in Osceola County, and off-site county and state road improvements — including three signalized intersections — supporting a 1.4 million square foot distribution center in Volusia County.
New roadway construction, lane widening and pavement reconstruction, including divided roadway sections and connector roads built to city and county standards.
Roundabout construction and signalized intersection improvements, including temporary paving and drainage while the intersection stays open.
Storm drainage, pond underdrain and roadway underdrain built with the roadway section rather than behind it.
Coordinating and executing relocations and adjustments of existing utilities, including placing overhead services underground, so the corridor can be rebuilt.
Cast-in-place retaining walls, permanent sheet pile wall with concrete barrier and bullet rail where the roadway section needs it.
Curb and gutter, concrete sidewalk, brick pavers, sodding, signing, pavement marking, signalization and maintenance of traffic through construction.
Widening, reconstruction and connector road contracts for public owners such as the City of Winter Garden, the City of Oviedo and Lake County.
The turn lanes, signals and roadway improvements a permit requires outside the property line, built by the same contractor doing the site.
Access and off-site roadway improvements for large facilities, including county and state road work supporting a distribution center.
We review roadway plans, cross-sections, geotechnical data and utility conflicts, then price the corridor scope by scope.
Maintenance of traffic, phasing, temporary drainage and utility coordination are planned before the first lane closure.
Earthwork, drainage, utility relocation, base, structures and paving move through the corridor in a planned sequence under SDC superintendents.
Final paving, curb, sidewalk, signing, pavement marking, sodding and the documentation the owner needs to accept the roadway.
3,300 LF of widening and a new roundabout, with pavement reconstruction, sheet pile wall, 4,200 LF of storm drainage and 20,000 SY of base and asphalt paving.
330-day City of Oviedo contract: excavation and embankment, storm drainage, utility relocations, new roadway, curbing, sidewalk and asphalt paving.
3,000 LF of new divided roadway with 165,000 CY of embankment, storm drainage, water main and 710 LF of cast-in-place retaining walls.
13-acre widening with 175,000 CY of earthwork, force main, 6,500 LF of storm drainage, 5,250 LF of underdrain, limerock base and asphalt paving.
Off-site county and state road improvements over a 7-month contract, including three signalized intersection improvements and 20,000 SY of base and paving.
Roadway construction and utility improvements with drainage, curb and gutter, sidewalks, signalization and final paving.