Westside Blvd

Kissimmee, Osceola, Florida 2024-2025

Owner Information

Lennar

Designer Information

Hamilton Engineering & Surveying, LLC

Details of Work Performed

As part of the larger Westside Development initiative, SDC was selected by Lennar Homes to complete a critical missing link along Westside Boulevard. This infrastructure project included the construction of 3,000 linear feet of divided roadway and a wide range of sitework and utility improvements, further enhancing regional mobility and access.

Improvements Include:

  • 165,000 CY of Embankment
  • Subsoil removal
  • 6,700 LF of Storm drainage
  • Placement of Bold & Gold filtration media
  • 3,300 LF of 24″ & 30″ Water main
  • 710 LF of Cast-in-place retaining walls
  • Flatwork
  • Base & Asphalt paving