This 34 acre site located on South Poinciana Blvd,
Improvements include
- clearing & grubbing
- 53,000 cy of on-site excavation
- import of 72,000 cy
- logistics support/grading for the General Contractor
- 2,050 lf of 8” sanitary sewer
- lift station with 130 lf 4” force main
- 3,300 lf of storm drainage
- 1,100 lf of corrugated exfiltration pipe
- roof drainage
- rip rap
- 3,300 lf of water main
- 6” fire line
Other works include
- civil site package includes 28,100 sy of base & paving
- curb & gutter
- pavement markings
- signage
- wheel stops